CFE power factor: how the surcharge or the credit is calculated

CFE compares your plant’s power factor with a reference. If you fall below, it adds a surcharge of up to 120% to your bill. If you are above, it subtracts a credit of up to 2.5%. With the 97% reference, the credit does not exceed 0.8%. The reference is 90% for most services. For industrial services of 1 MW or more it has been 97% since April 2026.

Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026

Power factor in one minute

  • Below the reference there is a surcharge. At the reference or above there is a credit.
  • The reference is 90% for most services.
  • At medium voltage with 1 MW or more, and at high voltage, it has been 97% since April 2026.
  • The surcharge goes up to 120% and the credit up to 2.5% (0.8% with the 97% reference).
  • It applies to the bill subtotal, before VAT.

1. What is power factor and what does CFE charge you?

Power factor is the share of the energy you draw from the grid that is turned into useful work. The rest is reactive energy (kVArh), which motors, compressors and transformers draw.

CFE compares your average power factor for the month with a reference. If you fall below, it adds a surcharge. If you are at the reference or above, it subtracts a credit. The percentage applies to the bill subtotal, and VAT is calculated afterwards.

2. The surcharge and credit formulas

Surcharge (%) = 3/5 × (reference ÷ your power factor − 1) × 100

Credit (%) = 1/4 × (1 − reference ÷ your power factor) × 100

The result is rounded to one decimal. The surcharge is capped at 120% and the credit at 2.5%.

3. The reference: 90, 95 or 97%

Your serviceReferenceSince when
Medium voltage with a contracted demand under 1 MW90%It is the tariff’s general rule
Medium voltage with 1 MW or more, and high voltage97%Since April 9, 2026. Until April 8 it was 95%

In the second case the tariff does not set the reference: it is the power factor the Grid Code requires of those services.

Guide to the Grid Code and power factor

4. Calculate your surcharge or your credit

Move the slider. If you enter your bill subtotal, the result comes out in pesos.

Adjust your power factor

Your service
95.7%
70%100%

Below 97% there is a surcharge. At 97% or above there is a credit.

A surcharge of 0.8% on your bill subtotal.

On the example bill that would be MXN 34,320 more that month.

5. Example with a bill

A sample bill for January 2026, with a power factor of 95.73% and more than 1 MW of demand. The reference was still 95%: 1/4 × (1 − 95 ÷ 95.73) × 100 = 0.19, which rounds to 0.2%. That 0.2% of MXN 4,289,969.64 is the MXN 8,579.94 credit on the bill.

With the 97% reference, that same 95.73% no longer earns a credit. It gives a surcharge of 0.8%, about MXN 34,320 on the same subtotal.

See the full bill

6. How is a low power factor corrected?

By compensating reactive power inside your plant, so as not to draw it from the grid. It is done with a capacitor bank or with the inverter of a BESS.

At ENEGRIN, power factor correction is part of the BESS solution, with its capacitors. A surcharge shrinks or turns into a credit, and an existing credit grows.

How many kVAr your capacitor bank needs · How the BESS works

7. Frequently asked questions

What is the minimum power factor CFE requires?

For most services, 90%. At medium voltage with a contracted demand of 1 MW or more, and at high voltage, it is the one the Grid Code requires: 97% since April 2026.

How large can the low power factor surcharge be?

Up to 120% of the bill subtotal. The credit is capped at 2.5%.

Does the 97% apply to every company?

No. It applies to medium-voltage services with a contracted demand of 1 MW or more and to high-voltage services. The rest stay with the 90% reference.

Where is the power factor on the bill?

In the readings for the period, next to the kVArh, and in the 12-month history.

More on the GDMTH tariff

Send us your GDMTH bill and we’ll tell you which charge can be reduced.

An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.

Sources

  1. CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): power factor (section 5.5): 90% reference, rounding, caps and referral to the Grid Code for 1 MW or more.
  2. CRE, Grid Code (Código de Red), RES/550/2021, Official Gazette (DOF), December 31, 2021: manual of requirements for load centers, section 2.4: power factor of 0.95 until April 8, 2026 and 0.97 afterwards.
  3. SHCP (Mexico’s Finance Ministry), resolution amending the complementary provisions to the tariffs for the supply and sale of electricity, Official Gazette (DOF): power factor surcharge and credit formulas.
  4. Sample bill on the GDMTH tariff, calculated with the charges CFE published for January 2026.