CFE GDMTH tariffs 2026: every month, by division
These are CFE’s GDMTH tariff charges in 2026, month by month, for the 17 tariff divisions, before VAT. Choose your division and month, or open the full table for each month. The data comes from ENEGRIN’s tariff database, updated every month with what CFE publishes.
Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026
The 2026 tariffs in a minute
- The page lists the charges from January to November 2026, for the 17 divisions.
- In November 2026, capacity runs from MXN 246.78 to MXN 386.38 per kW, depending on the division.
- Every municipality in a division pays the same charges: all you need is your division.
- All charges are before VAT.
- The data downloads as CSV.
In this guide
To apply this to your plant, an ENEGRIN engineer replies the same business day.
Talk to an engineer1. Your division and your month
Choose your division and the month. The charges come from ENEGRIN’s tariff database, the same one the bill calculator uses.
Choose your division and the month
The gold dot marks where your division sits between the cheapest and the most expensive in the country.
This is how each charge ranges across the 17 divisions. Choose yours to see its charges.
Capacity
MXN 246.78 to MXN 386.38 per kW
Distribution
MXN 57.74 to MXN 221.09 per kW
Peak energy
MXN 1.2420 to MXN 3.6116 per kWh
Intermediate energy
MXN 0.9220 to MXN 2.5678 per kWh
Base energy
MXN 0.5964 to MXN 2.0239 per kWh
Fixed charge
MXN 197.77 to MXN 1,113.73 per month
Energy already includes MXN 0.1946 per kWh for transmission, CENACE and ancillary services. The Official Gazette (DOF) publishes those three charges separately.
2. Which division are you in?
Charges are set by division: every municipality in a division pays exactly the same. In most states, the whole state is in a single division. In states that are split among several, your division depends on your municipality.
| Division | Mostly covers |
|---|---|
| Baja California | Baja California and northwestern Sonora. |
| Baja California Sur | Baja California Sur. |
| Bajío | Guanajuato, Querétaro, Aguascalientes and Zacatecas. |
| Centro Occidente | Michoacán and Colima. |
| Centro Oriente | Puebla, Tlaxcala and Hidalgo. |
| Centro Sur | Guerrero, Morelos and part of the State of Mexico. |
| Golfo Centro | San Luis Potosí and southern Tamaulipas. |
| Golfo Norte | Nuevo León, Coahuila and northern Tamaulipas. |
| Jalisco | Jalisco and Nayarit. |
| Noroeste | Sonora and Sinaloa. |
| Norte | Chihuahua, Durango and the Laguna region of Coahuila. |
| Oriente | Veracruz. |
| Peninsular | Yucatán, Quintana Roo and Campeche. |
| Sureste | Chiapas, Tabasco and Oaxaca. |
| Valle de México Centro | Part of Mexico City and the State of Mexico. |
| Valle de México Norte | Part of Mexico City and the State of Mexico. |
| Valle de México Sur | Part of Mexico City and the State of Mexico. |
The fastest way: choose your state and municipality in the tool above, and it sets your division and its charges.
In split states, such as the State of Mexico, Mexico City, Coahuila, Sonora and Tamaulipas, your division depends on your municipality. CFE assigns each municipality to a division in its tariff lookup.
CFE lists some municipalities under a name that joins several divisions. The Álvaro Obregón borough, for example, appears as “Valle de México Norte, Centro y Sur”. That name is always billed at the charges of the first division it names, here Valle de México Norte. Other municipalities, such as Toluca, really are in two divisions with different charges. There it is worth confirming with CFE which one applies to you.
3. The charges for every month of 2026, division by division
These are the charges from January to November 2026, before VAT. Open the month you need.
November 2026Capacity from MXN 246.78 to MXN 386.38 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.5964 | MXN 0.9220 | MXN 1.2420 | MXN 90.01 | MXN 344.27 |
| Baja California Sur | MXN 414.90 | MXN 2.0239 | MXN 2.5678 | MXN 3.6116 | MXN 90.01 | MXN 246.78 |
| Bajío | MXN 427.19 | MXN 1.0228 | MXN 1.8107 | MXN 2.0620 | MXN 97.88 | MXN 377.16 |
| Centro Occidente | MXN 252.50 | MXN 1.0206 | MXN 1.8132 | MXN 2.0412 | MXN 155.41 | MXN 377.01 |
| Centro Oriente | MXN 335.36 | MXN 1.0181 | MXN 1.8141 | MXN 2.0466 | MXN 149.44 | MXN 373.66 |
| Centro Sur | MXN 264.38 | MXN 0.9368 | MXN 1.6485 | MXN 1.8649 | MXN 221.09 | MXN 350.90 |
| Golfo Centro | MXN 461.75 | MXN 0.9703 | MXN 1.6357 | MXN 1.8944 | MXN 124.41 | MXN 377.16 |
| Golfo Norte | MXN 502.03 | MXN 0.9904 | MXN 1.5333 | MXN 1.6634 | MXN 57.74 | MXN 386.38 |
| Jalisco | MXN 330.66 | MXN 0.9834 | MXN 1.7494 | MXN 1.9675 | MXN 160.25 | MXN 377.16 |
| Noroeste | MXN 197.77 | MXN 0.9408 | MXN 1.5035 | MXN 1.6657 | MXN 90.85 | MXN 377.16 |
| Norte | MXN 1,113.73 | MXN 0.9908 | MXN 1.5710 | MXN 1.8372 | MXN 72.92 | MXN 386.38 |
| Oriente | MXN 636.28 | MXN 0.9018 | MXN 1.5799 | MXN 1.7739 | MXN 202.45 | MXN 346.20 |
| Peninsular | MXN 452.58 | MXN 1.1951 | MXN 2.0068 | MXN 2.2385 | MXN 91.87 | MXN 377.16 |
| Sureste | MXN 487.31 | MXN 0.9804 | MXN 1.6963 | MXN 1.9016 | MXN 141.76 | MXN 331.76 |
| Valle de México Centro | MXN 540.49 | MXN 1.0739 | MXN 1.7685 | MXN 2.0638 | MXN 60.82 | MXN 386.38 |
| Valle de México Norte | MXN 703.36 | MXN 1.0711 | MXN 1.7563 | MXN 2.0518 | MXN 86.15 | MXN 386.38 |
| Valle de México Sur | MXN 422.07 | MXN 1.0816 | MXN 1.7787 | MXN 2.0787 | MXN 67.68 | MXN 386.38 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against October 2026, capacity fell in 12 and was unchanged in 5 of the 17 divisions. CFE’s monthly publication (in Spanish)
October 2026Capacity from MXN 246.78 to MXN 386.39 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.5964 | MXN 0.9221 | MXN 1.2420 | MXN 90.01 | MXN 344.27 |
| Baja California Sur | MXN 414.90 | MXN 2.0240 | MXN 2.5679 | MXN 3.6117 | MXN 90.01 | MXN 246.78 |
| Bajío | MXN 427.19 | MXN 1.0228 | MXN 1.8108 | MXN 2.0620 | MXN 97.88 | MXN 377.17 |
| Centro Occidente | MXN 252.50 | MXN 1.0206 | MXN 1.8133 | MXN 2.0412 | MXN 155.41 | MXN 377.02 |
| Centro Oriente | MXN 335.36 | MXN 1.0181 | MXN 1.8141 | MXN 2.0466 | MXN 149.44 | MXN 373.67 |
| Centro Sur | MXN 264.38 | MXN 0.9368 | MXN 1.6485 | MXN 1.8649 | MXN 221.09 | MXN 350.90 |
| Golfo Centro | MXN 461.75 | MXN 0.9703 | MXN 1.6358 | MXN 1.8944 | MXN 124.41 | MXN 377.17 |
| Golfo Norte | MXN 502.03 | MXN 0.9904 | MXN 1.5334 | MXN 1.6634 | MXN 57.74 | MXN 386.39 |
| Jalisco | MXN 330.66 | MXN 0.9834 | MXN 1.7494 | MXN 1.9675 | MXN 160.25 | MXN 377.17 |
| Noroeste | MXN 197.77 | MXN 0.9408 | MXN 1.5035 | MXN 1.6658 | MXN 90.85 | MXN 377.17 |
| Norte | MXN 1,113.73 | MXN 0.9908 | MXN 1.5711 | MXN 1.8372 | MXN 72.92 | MXN 386.39 |
| Oriente | MXN 636.28 | MXN 0.9018 | MXN 1.5799 | MXN 1.7739 | MXN 202.45 | MXN 346.20 |
| Peninsular | MXN 452.58 | MXN 1.1951 | MXN 2.0069 | MXN 2.2385 | MXN 91.87 | MXN 377.17 |
| Sureste | MXN 487.31 | MXN 0.9804 | MXN 1.6963 | MXN 1.9016 | MXN 141.76 | MXN 331.76 |
| Valle de México Centro | MXN 540.49 | MXN 1.0739 | MXN 1.7685 | MXN 2.0639 | MXN 60.82 | MXN 386.39 |
| Valle de México Norte | MXN 703.36 | MXN 1.0711 | MXN 1.7563 | MXN 2.0518 | MXN 86.15 | MXN 386.39 |
| Valle de México Sur | MXN 422.07 | MXN 1.0816 | MXN 1.7787 | MXN 2.0788 | MXN 67.68 | MXN 386.39 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against September 2026, capacity rose in 5 and was unchanged in 12 of the 17 divisions. Publication in the Official Gazette (in Spanish)
September 2026Capacity from MXN 246.78 to MXN 386.38 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.5964 | MXN 0.9220 | MXN 1.2420 | MXN 90.01 | MXN 344.27 |
| Baja California Sur | MXN 414.90 | MXN 2.0240 | MXN 2.5679 | MXN 3.6117 | MXN 90.01 | MXN 246.78 |
| Bajío | MXN 427.19 | MXN 1.0228 | MXN 1.8107 | MXN 2.0620 | MXN 97.88 | MXN 377.17 |
| Centro Occidente | MXN 252.50 | MXN 1.0206 | MXN 1.8133 | MXN 2.0412 | MXN 155.41 | MXN 377.02 |
| Centro Oriente | MXN 335.36 | MXN 1.0181 | MXN 1.8141 | MXN 2.0466 | MXN 149.44 | MXN 373.67 |
| Centro Sur | MXN 264.38 | MXN 0.9368 | MXN 1.6485 | MXN 1.8649 | MXN 221.09 | MXN 350.90 |
| Golfo Centro | MXN 461.75 | MXN 0.9703 | MXN 1.6358 | MXN 1.8944 | MXN 124.41 | MXN 377.17 |
| Golfo Norte | MXN 502.03 | MXN 0.9904 | MXN 1.5333 | MXN 1.6634 | MXN 57.74 | MXN 386.38 |
| Jalisco | MXN 330.66 | MXN 0.9834 | MXN 1.7494 | MXN 1.9675 | MXN 160.25 | MXN 377.17 |
| Noroeste | MXN 197.77 | MXN 0.9408 | MXN 1.5035 | MXN 1.6658 | MXN 90.85 | MXN 377.17 |
| Norte | MXN 1,113.73 | MXN 0.9908 | MXN 1.5711 | MXN 1.8372 | MXN 72.92 | MXN 386.38 |
| Oriente | MXN 636.28 | MXN 0.9018 | MXN 1.5799 | MXN 1.7739 | MXN 202.45 | MXN 346.20 |
| Peninsular | MXN 452.58 | MXN 1.1951 | MXN 2.0069 | MXN 2.2385 | MXN 91.87 | MXN 377.17 |
| Sureste | MXN 487.31 | MXN 0.9804 | MXN 1.6963 | MXN 1.9016 | MXN 141.76 | MXN 331.76 |
| Valle de México Centro | MXN 540.49 | MXN 1.0739 | MXN 1.7685 | MXN 2.0638 | MXN 60.82 | MXN 386.38 |
| Valle de México Norte | MXN 703.36 | MXN 1.0711 | MXN 1.7563 | MXN 2.0518 | MXN 86.15 | MXN 386.38 |
| Valle de México Sur | MXN 422.07 | MXN 1.0816 | MXN 1.7787 | MXN 2.0788 | MXN 67.68 | MXN 386.38 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against August 2026, capacity rose in 2 and was unchanged in 15 of the 17 divisions. Publication in the Official Gazette (in Spanish)
August 2026Capacity from MXN 246.78 to MXN 386.38 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.5964 | MXN 0.9220 | MXN 1.2420 | MXN 90.01 | MXN 344.27 |
| Baja California Sur | MXN 414.90 | MXN 2.0239 | MXN 2.5678 | MXN 3.6116 | MXN 90.01 | MXN 246.78 |
| Bajío | MXN 427.19 | MXN 1.0228 | MXN 1.8107 | MXN 2.0620 | MXN 97.88 | MXN 377.17 |
| Centro Occidente | MXN 252.50 | MXN 1.0206 | MXN 1.8132 | MXN 2.0412 | MXN 155.41 | MXN 377.01 |
| Centro Oriente | MXN 335.36 | MXN 1.0181 | MXN 1.8141 | MXN 2.0466 | MXN 149.44 | MXN 373.66 |
| Centro Sur | MXN 264.38 | MXN 0.9368 | MXN 1.6485 | MXN 1.8649 | MXN 221.09 | MXN 350.90 |
| Golfo Centro | MXN 461.75 | MXN 0.9703 | MXN 1.6357 | MXN 1.8944 | MXN 124.41 | MXN 377.17 |
| Golfo Norte | MXN 502.03 | MXN 0.9904 | MXN 1.5333 | MXN 1.6634 | MXN 57.74 | MXN 386.38 |
| Jalisco | MXN 330.66 | MXN 0.9834 | MXN 1.7494 | MXN 1.9675 | MXN 160.25 | MXN 377.17 |
| Noroeste | MXN 197.77 | MXN 0.9408 | MXN 1.5035 | MXN 1.6657 | MXN 90.85 | MXN 377.17 |
| Norte | MXN 1,113.73 | MXN 0.9908 | MXN 1.5710 | MXN 1.8372 | MXN 72.92 | MXN 386.38 |
| Oriente | MXN 636.28 | MXN 0.9018 | MXN 1.5799 | MXN 1.7739 | MXN 202.45 | MXN 346.20 |
| Peninsular | MXN 452.58 | MXN 1.1951 | MXN 2.0068 | MXN 2.2385 | MXN 91.87 | MXN 377.17 |
| Sureste | MXN 487.31 | MXN 0.9804 | MXN 1.6963 | MXN 1.9016 | MXN 141.76 | MXN 331.76 |
| Valle de México Centro | MXN 540.49 | MXN 1.0739 | MXN 1.7685 | MXN 2.0638 | MXN 60.82 | MXN 386.38 |
| Valle de México Norte | MXN 703.36 | MXN 1.0711 | MXN 1.7563 | MXN 2.0518 | MXN 86.15 | MXN 386.38 |
| Valle de México Sur | MXN 422.07 | MXN 1.0816 | MXN 1.7787 | MXN 2.0787 | MXN 67.68 | MXN 386.38 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against July 2026, capacity rose in 14 and was unchanged in 3 of the 17 divisions. Publication in the Official Gazette (in Spanish)
July 2026Capacity from MXN 246.78 to MXN 386.37 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.5964 | MXN 0.9220 | MXN 1.2420 | MXN 90.01 | MXN 344.26 |
| Baja California Sur | MXN 414.90 | MXN 2.0239 | MXN 2.5678 | MXN 3.6116 | MXN 90.01 | MXN 246.78 |
| Bajío | MXN 427.19 | MXN 1.0228 | MXN 1.8107 | MXN 2.0620 | MXN 97.88 | MXN 377.16 |
| Centro Occidente | MXN 252.50 | MXN 1.0206 | MXN 1.8132 | MXN 2.0412 | MXN 155.41 | MXN 377.01 |
| Centro Oriente | MXN 335.36 | MXN 1.0181 | MXN 1.8141 | MXN 2.0465 | MXN 149.44 | MXN 373.66 |
| Centro Sur | MXN 264.38 | MXN 0.9368 | MXN 1.6485 | MXN 1.8648 | MXN 221.09 | MXN 350.89 |
| Golfo Centro | MXN 461.75 | MXN 0.9703 | MXN 1.6357 | MXN 1.8943 | MXN 124.41 | MXN 377.16 |
| Golfo Norte | MXN 502.03 | MXN 0.9904 | MXN 1.5333 | MXN 1.6634 | MXN 57.74 | MXN 386.37 |
| Jalisco | MXN 330.66 | MXN 0.9834 | MXN 1.7494 | MXN 1.9674 | MXN 160.25 | MXN 377.16 |
| Noroeste | MXN 197.77 | MXN 0.9408 | MXN 1.5035 | MXN 1.6657 | MXN 90.85 | MXN 377.16 |
| Norte | MXN 1,113.73 | MXN 0.9908 | MXN 1.5710 | MXN 1.8372 | MXN 72.92 | MXN 386.37 |
| Oriente | MXN 636.28 | MXN 0.9018 | MXN 1.5799 | MXN 1.7738 | MXN 202.45 | MXN 346.19 |
| Peninsular | MXN 452.58 | MXN 1.1951 | MXN 2.0068 | MXN 2.2384 | MXN 91.87 | MXN 377.16 |
| Sureste | MXN 487.31 | MXN 0.9804 | MXN 1.6962 | MXN 1.9016 | MXN 141.76 | MXN 331.75 |
| Valle de México Centro | MXN 540.49 | MXN 1.0739 | MXN 1.7685 | MXN 2.0638 | MXN 60.82 | MXN 386.37 |
| Valle de México Norte | MXN 703.36 | MXN 1.0710 | MXN 1.7562 | MXN 2.0517 | MXN 86.15 | MXN 386.37 |
| Valle de México Sur | MXN 422.07 | MXN 1.0816 | MXN 1.7787 | MXN 2.0787 | MXN 67.68 | MXN 386.37 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against June 2026, capacity fell in 17 of the 17 divisions. Publication in the Official Gazette (in Spanish)
June 2026Capacity from MXN 251.81 to MXN 394.26 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6046 | MXN 0.9369 | MXN 1.2633 | MXN 90.01 | MXN 351.29 |
| Baja California Sur | MXN 414.90 | MXN 2.0613 | MXN 2.6163 | MXN 3.6813 | MXN 90.01 | MXN 251.81 |
| Bajío | MXN 427.19 | MXN 1.0397 | MXN 1.8437 | MXN 2.1001 | MXN 97.88 | MXN 384.86 |
| Centro Occidente | MXN 252.50 | MXN 1.0375 | MXN 1.8463 | MXN 2.0789 | MXN 155.41 | MXN 384.70 |
| Centro Oriente | MXN 335.36 | MXN 1.0349 | MXN 1.8471 | MXN 2.0843 | MXN 149.44 | MXN 381.29 |
| Centro Sur | MXN 264.38 | MXN 0.9519 | MXN 1.6781 | MXN 1.8989 | MXN 221.09 | MXN 358.05 |
| Golfo Centro | MXN 461.75 | MXN 0.9861 | MXN 1.6651 | MXN 1.9290 | MXN 124.41 | MXN 384.86 |
| Golfo Norte | MXN 502.03 | MXN 1.0067 | MXN 1.5606 | MXN 1.6934 | MXN 57.74 | MXN 394.26 |
| Jalisco | MXN 330.66 | MXN 0.9995 | MXN 1.7811 | MXN 2.0036 | MXN 160.25 | MXN 384.86 |
| Noroeste | MXN 197.77 | MXN 0.9560 | MXN 1.5302 | MXN 1.6958 | MXN 90.85 | MXN 384.86 |
| Norte | MXN 1,113.73 | MXN 1.0070 | MXN 1.5991 | MXN 1.8707 | MXN 72.92 | MXN 394.26 |
| Oriente | MXN 636.28 | MXN 0.9162 | MXN 1.6082 | MXN 1.8061 | MXN 202.45 | MXN 353.26 |
| Peninsular | MXN 452.58 | MXN 1.2155 | MXN 2.0438 | MXN 2.2802 | MXN 91.87 | MXN 384.86 |
| Sureste | MXN 487.31 | MXN 0.9964 | MXN 1.7269 | MXN 1.9364 | MXN 141.76 | MXN 338.52 |
| Valle de México Centro | MXN 540.49 | MXN 1.0918 | MXN 1.8006 | MXN 2.1020 | MXN 60.82 | MXN 394.26 |
| Valle de México Norte | MXN 703.36 | MXN 1.0889 | MXN 1.7881 | MXN 2.0896 | MXN 86.15 | MXN 394.26 |
| Valle de México Sur | MXN 422.07 | MXN 1.0997 | MXN 1.8110 | MXN 2.1172 | MXN 67.68 | MXN 394.26 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against May 2026, capacity fell in 17 of the 17 divisions. CFE’s monthly publication (in Spanish)
May 2026Capacity from MXN 254.35 to MXN 398.22 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6087 | MXN 0.9443 | MXN 1.2741 | MXN 90.01 | MXN 354.82 |
| Baja California Sur | MXN 414.90 | MXN 2.0800 | MXN 2.6406 | MXN 3.7164 | MXN 90.01 | MXN 254.35 |
| Bajío | MXN 427.19 | MXN 1.0482 | MXN 1.8603 | MXN 2.1192 | MXN 97.88 | MXN 388.73 |
| Centro Occidente | MXN 252.50 | MXN 1.0459 | MXN 1.8629 | MXN 2.0978 | MXN 155.41 | MXN 388.57 |
| Centro Oriente | MXN 335.36 | MXN 1.0433 | MXN 1.8637 | MXN 2.1033 | MXN 149.44 | MXN 385.12 |
| Centro Sur | MXN 264.38 | MXN 0.9595 | MXN 1.6931 | MXN 1.9161 | MXN 221.09 | MXN 361.65 |
| Golfo Centro | MXN 461.75 | MXN 0.9941 | MXN 1.6799 | MXN 1.9465 | MXN 124.41 | MXN 388.73 |
| Golfo Norte | MXN 502.03 | MXN 1.0148 | MXN 1.5744 | MXN 1.7084 | MXN 57.74 | MXN 398.22 |
| Jalisco | MXN 330.66 | MXN 1.0076 | MXN 1.7970 | MXN 2.0218 | MXN 160.25 | MXN 388.73 |
| Noroeste | MXN 197.77 | MXN 0.9637 | MXN 1.5436 | MXN 1.7108 | MXN 90.85 | MXN 388.73 |
| Norte | MXN 1,113.73 | MXN 1.0152 | MXN 1.6132 | MXN 1.8876 | MXN 72.92 | MXN 398.22 |
| Oriente | MXN 636.28 | MXN 0.9234 | MXN 1.6224 | MXN 1.8223 | MXN 202.45 | MXN 356.81 |
| Peninsular | MXN 452.58 | MXN 1.2258 | MXN 2.0624 | MXN 2.3011 | MXN 91.87 | MXN 388.73 |
| Sureste | MXN 487.31 | MXN 1.0045 | MXN 1.7423 | MXN 1.9539 | MXN 141.76 | MXN 341.93 |
| Valle de México Centro | MXN 540.49 | MXN 1.1009 | MXN 1.8167 | MXN 2.1211 | MXN 60.82 | MXN 398.22 |
| Valle de México Norte | MXN 703.36 | MXN 1.0979 | MXN 1.8041 | MXN 2.1087 | MXN 86.15 | MXN 398.22 |
| Valle de México Sur | MXN 422.07 | MXN 1.1088 | MXN 1.8273 | MXN 2.1365 | MXN 67.68 | MXN 398.22 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against April 2026, capacity fell in 17 of the 17 divisions. CFE’s monthly publication (in Spanish)
April 2026Capacity from MXN 256.91 to MXN 402.24 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6129 | MXN 0.9519 | MXN 1.2850 | MXN 90.01 | MXN 358.40 |
| Baja California Sur | MXN 414.90 | MXN 2.0990 | MXN 2.6653 | MXN 3.7519 | MXN 90.01 | MXN 256.91 |
| Bajío | MXN 427.19 | MXN 1.0568 | MXN 1.8771 | MXN 2.1386 | MXN 97.88 | MXN 392.65 |
| Centro Occidente | MXN 252.50 | MXN 1.0545 | MXN 1.8797 | MXN 2.1170 | MXN 155.41 | MXN 392.49 |
| Centro Oriente | MXN 335.36 | MXN 1.0519 | MXN 1.8806 | MXN 2.1226 | MXN 149.44 | MXN 389.00 |
| Centro Sur | MXN 264.38 | MXN 0.9673 | MXN 1.7082 | MXN 1.9334 | MXN 221.09 | MXN 365.30 |
| Golfo Centro | MXN 461.75 | MXN 1.0022 | MXN 1.6949 | MXN 1.9641 | MXN 124.41 | MXN 392.65 |
| Golfo Norte | MXN 502.03 | MXN 1.0231 | MXN 1.5883 | MXN 1.7237 | MXN 57.74 | MXN 402.24 |
| Jalisco | MXN 330.66 | MXN 1.0158 | MXN 1.8132 | MXN 2.0402 | MXN 160.25 | MXN 392.65 |
| Noroeste | MXN 197.77 | MXN 0.9714 | MXN 1.5572 | MXN 1.7261 | MXN 90.85 | MXN 392.65 |
| Norte | MXN 1,113.73 | MXN 1.0234 | MXN 1.6275 | MXN 1.9046 | MXN 72.92 | MXN 402.24 |
| Oriente | MXN 636.28 | MXN 0.9308 | MXN 1.6368 | MXN 1.8387 | MXN 202.45 | MXN 360.41 |
| Peninsular | MXN 452.58 | MXN 1.2362 | MXN 2.0812 | MXN 2.3224 | MXN 91.87 | MXN 392.65 |
| Sureste | MXN 487.31 | MXN 1.0126 | MXN 1.7579 | MXN 1.9716 | MXN 141.76 | MXN 345.37 |
| Valle de México Centro | MXN 540.49 | MXN 1.1100 | MXN 1.8331 | MXN 2.1406 | MXN 60.82 | MXN 402.24 |
| Valle de México Norte | MXN 703.36 | MXN 1.1070 | MXN 1.8204 | MXN 2.1280 | MXN 86.15 | MXN 402.24 |
| Valle de México Sur | MXN 422.07 | MXN 1.1180 | MXN 1.8437 | MXN 2.1561 | MXN 67.68 | MXN 402.24 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against March 2026, capacity fell in 17 of the 17 divisions. CFE’s monthly publication (in Spanish)
March 2026Capacity from MXN 256.92 to MXN 402.26 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6129 | MXN 0.9519 | MXN 1.2850 | MXN 90.01 | MXN 358.41 |
| Baja California Sur | MXN 414.90 | MXN 2.0991 | MXN 2.6654 | MXN 3.7520 | MXN 90.01 | MXN 256.92 |
| Bajío | MXN 427.19 | MXN 1.0568 | MXN 1.8771 | MXN 2.1387 | MXN 97.88 | MXN 392.66 |
| Centro Occidente | MXN 252.50 | MXN 1.0545 | MXN 1.8798 | MXN 2.1171 | MXN 155.41 | MXN 392.51 |
| Centro Oriente | MXN 335.36 | MXN 1.0519 | MXN 1.8806 | MXN 2.1227 | MXN 149.44 | MXN 389.02 |
| Centro Sur | MXN 264.38 | MXN 0.9673 | MXN 1.7082 | MXN 1.9335 | MXN 221.09 | MXN 365.31 |
| Golfo Centro | MXN 461.75 | MXN 1.0022 | MXN 1.6950 | MXN 1.9642 | MXN 124.41 | MXN 392.66 |
| Golfo Norte | MXN 502.03 | MXN 1.0231 | MXN 1.5883 | MXN 1.7238 | MXN 57.74 | MXN 402.26 |
| Jalisco | MXN 330.66 | MXN 1.0158 | MXN 1.8133 | MXN 2.0403 | MXN 160.25 | MXN 392.66 |
| Noroeste | MXN 197.77 | MXN 0.9715 | MXN 1.5573 | MXN 1.7262 | MXN 90.85 | MXN 392.66 |
| Norte | MXN 1,113.73 | MXN 1.0235 | MXN 1.6276 | MXN 1.9047 | MXN 72.92 | MXN 402.26 |
| Oriente | MXN 636.28 | MXN 0.9308 | MXN 1.6369 | MXN 1.8387 | MXN 202.45 | MXN 360.42 |
| Peninsular | MXN 452.58 | MXN 1.2362 | MXN 2.0813 | MXN 2.3225 | MXN 91.87 | MXN 392.66 |
| Sureste | MXN 487.31 | MXN 1.0127 | MXN 1.7580 | MXN 1.9717 | MXN 141.76 | MXN 345.39 |
| Valle de México Centro | MXN 540.49 | MXN 1.1100 | MXN 1.8332 | MXN 2.1406 | MXN 60.82 | MXN 402.26 |
| Valle de México Norte | MXN 703.36 | MXN 1.1071 | MXN 1.8204 | MXN 2.1281 | MXN 86.15 | MXN 402.26 |
| Valle de México Sur | MXN 422.07 | MXN 1.1181 | MXN 1.8438 | MXN 2.1562 | MXN 67.68 | MXN 402.26 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against February 2026, capacity rose in 17 of the 17 divisions. CFE’s monthly publication (in Spanish)
February 2026Capacity from MXN 256.77 to MXN 402.01 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6126 | MXN 0.9515 | MXN 1.2844 | MXN 90.01 | MXN 358.20 |
| Baja California Sur | MXN 414.90 | MXN 2.0980 | MXN 2.6639 | MXN 3.7499 | MXN 90.01 | MXN 256.77 |
| Bajío | MXN 427.19 | MXN 1.0563 | MXN 1.8761 | MXN 2.1375 | MXN 97.88 | MXN 392.43 |
| Centro Occidente | MXN 252.50 | MXN 1.0540 | MXN 1.8787 | MXN 2.1159 | MXN 155.41 | MXN 392.27 |
| Centro Oriente | MXN 335.36 | MXN 1.0514 | MXN 1.8796 | MXN 2.1215 | MXN 149.44 | MXN 388.78 |
| Centro Sur | MXN 264.38 | MXN 0.9668 | MXN 1.7073 | MXN 1.9325 | MXN 221.09 | MXN 365.09 |
| Golfo Centro | MXN 461.75 | MXN 1.0017 | MXN 1.6941 | MXN 1.9632 | MXN 124.41 | MXN 392.43 |
| Golfo Norte | MXN 502.03 | MXN 1.0226 | MXN 1.5875 | MXN 1.7228 | MXN 57.74 | MXN 402.01 |
| Jalisco | MXN 330.66 | MXN 1.0153 | MXN 1.8123 | MXN 2.0392 | MXN 160.25 | MXN 392.43 |
| Noroeste | MXN 197.77 | MXN 0.9710 | MXN 1.5565 | MXN 1.7253 | MXN 90.85 | MXN 392.43 |
| Norte | MXN 1,113.73 | MXN 1.0230 | MXN 1.6267 | MXN 1.9037 | MXN 72.92 | MXN 402.01 |
| Oriente | MXN 636.28 | MXN 0.9304 | MXN 1.6360 | MXN 1.8378 | MXN 202.45 | MXN 360.21 |
| Peninsular | MXN 452.58 | MXN 1.2356 | MXN 2.0802 | MXN 2.3212 | MXN 91.87 | MXN 392.43 |
| Sureste | MXN 487.31 | MXN 1.0122 | MXN 1.7570 | MXN 1.9706 | MXN 141.76 | MXN 345.18 |
| Valle de México Centro | MXN 540.49 | MXN 1.1095 | MXN 1.8322 | MXN 2.1395 | MXN 60.82 | MXN 402.01 |
| Valle de México Norte | MXN 703.36 | MXN 1.1065 | MXN 1.8194 | MXN 2.1269 | MXN 86.15 | MXN 402.01 |
| Valle de México Sur | MXN 422.07 | MXN 1.1175 | MXN 1.8428 | MXN 2.1550 | MXN 67.68 | MXN 402.01 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. Against January 2026, capacity rose in 17 of the 17 divisions. CFE’s monthly publication (in Spanish)
January 2026Capacity from MXN 256.62 to MXN 401.78 per kW
Swipe the table to see every charge.
| Division | Fixed | Base | Intermediate | Peak | Distribution | Capacity |
|---|---|---|---|---|---|---|
| Baja California | MXN 414.90 | MXN 0.6124 | MXN 0.9510 | MXN 1.2837 | MXN 90.01 | MXN 357.99 |
| Baja California Sur | MXN 414.90 | MXN 2.0969 | MXN 2.6624 | MXN 3.7478 | MXN 90.01 | MXN 256.62 |
| Bajío | MXN 427.19 | MXN 1.0558 | MXN 1.8752 | MXN 2.1364 | MXN 97.88 | MXN 392.20 |
| Centro Occidente | MXN 252.50 | MXN 1.0535 | MXN 1.8778 | MXN 2.1148 | MXN 155.41 | MXN 392.04 |
| Centro Oriente | MXN 335.36 | MXN 1.0509 | MXN 1.8786 | MXN 2.1204 | MXN 149.44 | MXN 388.56 |
| Centro Sur | MXN 264.38 | MXN 0.9664 | MXN 1.7064 | MXN 1.9314 | MXN 221.09 | MXN 364.88 |
| Golfo Centro | MXN 461.75 | MXN 1.0012 | MXN 1.6932 | MXN 1.9621 | MXN 124.41 | MXN 392.20 |
| Golfo Norte | MXN 502.03 | MXN 1.0222 | MXN 1.5867 | MXN 1.7219 | MXN 57.74 | MXN 401.78 |
| Jalisco | MXN 330.66 | MXN 1.0148 | MXN 1.8114 | MXN 2.0381 | MXN 160.25 | MXN 392.20 |
| Noroeste | MXN 197.77 | MXN 0.9706 | MXN 1.5557 | MXN 1.7244 | MXN 90.85 | MXN 392.20 |
| Norte | MXN 1,113.73 | MXN 1.0225 | MXN 1.6259 | MXN 1.9027 | MXN 72.92 | MXN 401.78 |
| Oriente | MXN 636.28 | MXN 0.9300 | MXN 1.6351 | MXN 1.8368 | MXN 202.45 | MXN 360.00 |
| Peninsular | MXN 452.58 | MXN 1.2350 | MXN 2.0791 | MXN 2.3200 | MXN 91.87 | MXN 392.20 |
| Sureste | MXN 487.31 | MXN 1.0117 | MXN 1.7561 | MXN 1.9696 | MXN 141.76 | MXN 344.98 |
| Valle de México Centro | MXN 540.49 | MXN 1.1090 | MXN 1.8312 | MXN 2.1383 | MXN 60.82 | MXN 401.78 |
| Valle de México Norte | MXN 703.36 | MXN 1.1060 | MXN 1.8185 | MXN 2.1258 | MXN 86.15 | MXN 401.78 |
| Valle de México Sur | MXN 422.07 | MXN 1.1170 | MXN 1.8419 | MXN 2.1538 | MXN 67.68 | MXN 401.78 |
Fixed charge, per month. Base, intermediate and peak, per kWh. Distribution and capacity, per kW. Before VAT. CFE’s monthly publication (in Spanish)
4. Download the data
Download every month and the 17 divisions (CSV)
You can use and publish this data, citing the source (CC BY 4.0 license).
5. Where the data comes from
CFE publishes the GDMTH tariff charges for each division every month. ENEGRIN’s system reads them from that publication, stores them in its database, and this site takes them from there. They are the same charges we use to calculate each plant’s bill.
6. Frequently asked questions
How many divisions does the GDMTH tariff have?
17. Every municipality in a division pays the same charges, so all you need to know is which division your plant belongs to.
How do I know which division I am in?
In most states, the whole state is in a single division. In states that are split among several, such as the State of Mexico and Mexico City, it depends on your municipality: the official list is in section 5.9 of the CNE tariff resolution.
How often do the charges change?
Every month. CFE publishes the energy, capacity and distribution charges for each division.
Do these charges include VAT?
No. All of them are before VAT. Energy already includes transmission, CENACE and ancillary services.
Can I download the data?
Yes. The CSV file has every month and the 17 divisions. Column names are in Spanish.
More on the GDMTH tariff
- GDMTH tariffWhat it is, its charges and what it costs in each division
- How to read your CFE billEvery line, with a sample bill
- CFE peak hoursBase, intermediate and peak, hour by hour
- Billable demand and capacity chargeHow it is calculated and what your peak costs
- Power factorSurcharge, credit and the 97% reference
- GDMTH bill calculatorYour bill by division and by month
Send us your GDMTH bill and we’ll tell you which charge can be reduced.
An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.
Sources
- CFE, final basic supply tariffs, GDMTH tariff, effective November 1, 2026: charges of the 17 divisions, taken from CFE’s monthly publication.
- CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): tariff divisions, categories and calculation rules.
- CFE, GDMTH tariff: monthly charges by division.