CFE bill calculator for the GDMTH tariff
Choose your division and the month, copy seven numbers from your bill and the calculator builds your CFE bill on the GDMTH tariff line by line, with the charges published for that month.
Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026
Build your bill
It comes loaded with the consumption of a sample bill from January 2026. That month it earned a credit with the 95% power factor reference. With the 97% reference, in force since April 2026, it gives a surcharge. Choose your division and the month, or enter your own figures.
With these figures and November 2026 charges, your bill would run from MXN 3,507,504.79 (Baja California) to MXN 6,924,208.27 (Baja California Sur), including VAT, depending on the division.
Choose your division above to see each line.
An estimate with the charges CFE publishes each month. It does not include the public lighting fee, which each municipality sets. Your bill may differ because of rounding. The calculation runs in your browser and is not stored.
In this guide
To apply this to your plant, an ENEGRIN engineer replies the same business day.
Talk to an engineer1. Which figures it asks for and where they are on your bill
| Figure | Where it is on the bill |
|---|---|
| Base, intermediate and peak kWh | In the readings for the period. It is the energy you used in each time band. |
| Peak kW | In the readings for the period. It is your highest demand in peak hours. |
| kWMax | In the readings for the period. It is your highest demand of the month. |
| Days in the period | They come from the billing period: from the day it starts to the day it ends. |
| Power factor | In the readings for the period and in the 12-month history. |
2. How it does the calculation
- It multiplies your kWh in each time band by your division’s generation charge for that month.
- It adds transmission, CENACE and ancillary services on all your kWh.
- It calculates the demand cap: your consumption ÷ (24 × days × 0.57). It bills capacity on the lower of your peak kW and the cap, and distribution on the lower of your kWMax and the cap.
- It adds the fixed charge. That is the subtotal.
- It applies the power factor surcharge or credit, and then 16% VAT.
3. Where the charges come from
From those CFE publishes every month for the 17 divisions. The months from January 2026 to November 2026 are loaded.
The consumption loaded in the calculator is that of a sample January 2026 bill, which had a subtotal of MXN 4,289,969.64. At November 2026 charges, that same consumption gives MXN 4,149,071.38: 3.3% less.
4. What it does not include
The public lighting fee, which each municipality sets. Nor CFE’s rounding or balances and adjustments from other months.
The calculator tells you how much you pay and why. The Ollin Simulator estimates how much a BESS would save you, with your plant’s bills.
5. Frequently asked questions
Does the calculator store my data?
No. The calculation runs in your browser. Nothing you enter is stored or sent.
Why does it not match my bill to the cent?
For three reasons: it does not include your municipality’s public lighting fee, CFE rounds each line, and your bill may carry balances or adjustments from other months.
Does it work for other tariffs?
No. It uses the charges and formulas of the GDMTH tariff, which is the medium-voltage tariff for a demand of 100 kW or more.
How often are the charges updated?
Every month, when CFE publishes the new charges.
More on the GDMTH tariff
- GDMTH tariffWhat it is, its charges and what it costs in each division
- How to read your CFE billEvery line, with a sample bill
- CFE peak hoursBase, intermediate and peak, hour by hour
- Billable demand and capacity chargeHow it is calculated and what your peak costs
- Power factorSurcharge, credit and the 97% reference
- GDMTH tariffs 2026, month by monthThe charges of the 17 divisions in every month of the year
Send us your GDMTH bill and we’ll tell you which charge can be reduced.
An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.
Sources
- CFE, final basic supply tariffs, GDMTH tariff, effective November 1, 2026: charges of the 17 divisions, taken from CFE’s monthly publication.
- CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): formulas for demand, load factor and power factor.
- CRE, Grid Code (Código de Red), RES/550/2021, Official Gazette (DOF), December 31, 2021: manual of requirements for load centers, section 2.4: power factor of 0.95 until April 8, 2026 and 0.97 afterwards.
- Sample bill on the GDMTH tariff, calculated with the charges CFE published for January 2026.