Guide · Tariff

The GDMTH tariff explained: billable demand, capacity charge and peak hours

CFE’s GDMTH tariff (large demand, medium voltage, time-of-use) charges for energy according to when you use it, and charges separately for your demand. These are its items, with the Norte division charges for July 2026.

What is the GDMTH tariff?

It is CFE’s tariff for large consumers connected at medium voltage. It has three time bands with different energy prices (base, intermediate and peak) and charges for the demand your plant registers.

What are the base, intermediate and peak bands?

BandWhenCharge (Norte, July 2026)
BaseEarly morning, the cheapest bandMXN 0.9908/kWh
IntermediateMost of the dayMXN 1.5710/kWh
PeakThe most expensive band: 18:00 to 22:00 in winter, in the Norte divisionMXN 1.8372/kWh, 85 % more than base

What is billable demand?

It is the demand in kW that CFE charges you. It is driven by your maximum demand during peak hours: the higher your peak in that band, the more you pay.

How are the capacity and distribution charges calculated?

ChargeHow it is calculatedNorte, July 2026
CapacityOn your billable demandMXN 386.37/kW
DistributionOn the maximum measured demand, with a capMXN 72.92/kW

What does power factor cost?

If your power factor is below 90 %, CFE adds a surcharge; above 90 %, it gives you a credit. Separately, the Grid Code has required 0.97 since April 2026 for medium-voltage plants of 1 MW or more.

Grid Code guide

Which charges does a BESS lower?

  • Peak energy: the BESS discharges in that band and your plant draws from the batteries. This is the main source of savings.
  • Capacity: by cutting peak demand, billable demand falls and this charge with it.
  • Distribution: falls as the maximum demand registered by the meter falls.
  • Power factor: the inverter compensates reactive power continuously: a surcharge is reduced or becomes a credit, and an existing credit grows.
  • Base energy: rises slightly, because the BESS charges its batteries in that band, when energy costs less.

Explore a GDMTH bill item by item

Go to the Ollin Platform and sign up to simulate your real savings with an ENEGRIN BESS.

Sources

  1. CFE, GDMTH tariff, Norte division, July 2026 (charges published by CFE).
  2. CRE, Grid Code, RES/550/2021 (DOF, December 31, 2021).