The grid will not grow at the pace of your plant, and every outage or voltage fluctuation costs production and equipment. The law now permits the alternative. ENEGRIN designs, finances and operates it: your own stable, high-quality power, measured with CFE’s formulas. Under the shared-savings model, the client does not invest.
Sources and references
Sources: 1 CNE, 2024 Reliability Report of the National Electric System (SEN) (Nov. 2025). 2 AMPIP (Mexican Association of Industrial Parks), study «Los parques industriales como instrumento de desarrollo nacional: retos en materia energética» (2023 data). 3 SENER (Mexico's Ministry of Energy), PLADESE 2025–2039 (DOF, Mexico's Official Gazette, Oct 17, 2025): SEN peak demand from 55,528 MWh/h in 2024 to 83,643 MWh/h in 2039 (+50.6 %). 4 Electricity Sector Law, arts. 17, 18 and 30–32 (DOF, Mar 18, 2025). 5 CNE, general administrative provisions (DACG) on storage (DOF, Apr 16, 2026). 6 SENER, Guidelines for the Self-Consumption One-Stop Shop (DOF, May 8, 2026), section 7.2.4. 7 Energy Sector Program 2025–2030 (DOF, Dec 22, 2025). 8 IEA, Global Energy Review 2026. GDMTH series: CFE monthly publications by division, compiled by ENEGRIN.