What do the 2026 provisions say?
A BESS (battery energy storage system) associated with your load center is treated as part of your facilities. It does not require a storage permit, as long as the energy is used only at your plant, without injecting it into or selling it to the grid.
What is required?
- The technical study with CENACE (Mexico’s grid operator) for the modification of your load center.
- Compliance with the Grid Code, NOM-001-SEDE-2012 and the technical standards the provisions require.
Which standards does ENEGRIN’s system meet?
The system we install is certified to IEC 62619 and IEC 62933-5-2, standards listed in those provisions.
Who handles the filings?
ENEGRIN handles them as part of the project.
If you also generate power at your plant: self-consumption guide
Go to the Ollin Platform and sign up to simulate your real savings with an ENEGRIN BESS.
Sources
- CNE, general administrative provisions on energy storage, DOF Apr 16, 2026.
- NOM-001-SEDE-2012, electrical installations (use).
- IEC 62619 and IEC 62933-5-2.