Guide · Power factor

Capacitor bank: what it is for and how to size it

A capacitor bank corrects your plant’s power factor. It supplies on site the reactive power your motors and transformers need, removes CFE’s surcharge and helps meet Mexico’s Grid Code. Its size is calculated in kVAr, with your demand and two power factors.

Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026

The capacitor bank in one minute

  • It corrects the power factor: it supplies, right at the load, the reactive power that used to come from the grid.
  • It removes the bill surcharge, can earn a credit and frees up capacity in cables and transformer.
  • It is sized with your demand in kW, the power factor you have and the one you want.
  • Plants with a variable load use an automatic bank. Where there are harmonics, it needs reactors.
  • Overcompensating is also a problem: the Grid Code requires 0.97 lagging to 1.0.

1. What is a capacitor bank?

It is a set of capacitors connected to your plant’s electrical installation to deliver reactive power. It is measured in kVAr.

Motors, compressors, transformers and induction furnaces need reactive power to create their magnetic fields. It does no work, but it takes up capacity in your cables and in the grid. The bank generates it next to the load, and the grid stops carrying it.

2. What it is for

EffectWhat you gain
Removes the surchargeIf your power factor is below your tariff’s reference, CFE adds a surcharge on the bill subtotal. Once corrected, it disappears.
Earns a creditAbove the reference, CFE subtracts a credit: up to 2.5% with a 90% reference and up to 0.8% with a 97% reference.
Helps meet the Grid CodeWith 1 MW or more at medium voltage, or at high voltage, your power factor must be between 0.97 and 1.0 at least 95% of the month.
Frees up capacityIt lowers the current through your cables and transformer, with fewer losses and less voltage drop.

How CFE calculates the surcharge and the credit · What the Grid Code requires

3. How it is sized

Three figures are needed: your demand in kW, the power factor you have and the one you want to reach.

kVAr needed = kW × (tan φ1 − tan φ2)

φ1 is the angle of the power factor you have and φ2 that of the one you want. Power factor is the cosine of that angle.

Example: a plant with 1,000 kW and a power factor of 80% that wants to reach 97%. The tangent goes from 0.750 to 0.251, and the difference times 1,000 kW gives 499 kVAr.

How many kVAr does your bank need?

Enter your demand and move the two sliders: the power factor you have and the one you want.

80%
50%99%
97%
85%100%

You need to compensate about 499 kVAr.

Your plant draws 750 kVAr from the grid today. At 97% it would draw 251 kVAr.

Apparent power falls from 1,250 to 1,031 kVA: 17.5% less current through your cables and transformer.

This is a first estimate with your average demand. The final size comes from measuring your plant, because reactive power changes with the load and harmonics change the design.

4. Fixed or automatic

TypeHow it worksWhen it is used
FixedAlways delivers the same kVAr.Constant loads, such as a large motor that runs the whole shift.
AutomaticA controller measures the power factor and switches capacitor steps in or out.Plants where the load changes during the day. It is the most common in industry.
With reactors or filtersEach step has a reactor that prevents resonance with harmonics.Plants with variable speed drives, rectifiers or furnaces.
Electronic compensationAn inverter delivers or absorbs reactive power continuously, without steps.Loads that change very fast, or when the inverter is already there, as in a BESS.

5. The two risks: harmonics and overcompensation

A poorly chosen bank can cause problems you did not have before.

  • Resonance. The capacitors and the inductance of your installation form a circuit that can amplify the harmonics from your drives and rectifiers. It is avoided by measuring harmonics before buying and, if needed, with banks with reactors.
  • Overcompensation. If the bank delivers more kVAr than your plant needs, the power factor turns leading and voltage rises. It happens with fixed banks when the load falls, for example on weekends.

That is why the size is defined with measurements of your plant over a week, not with a nameplate figure.

6. Capacitor bank or BESS?

If the only thing you want to solve is power factor, the capacitor bank is the direct solution and the one with the lowest cost.

A BESS also solves it, because its inverter compensates reactive power continuously, up to its capacity. If your plant needs more, it is combined with a bank. It makes sense when you also want to lower peak energy and demand, which are larger charges on the bill. In that case the power factor is corrected with the same equipment.

At ENEGRIN, the capacitor bank comes inside the BESS solution. We do not sell it separately.

What a BESS is and which charges it lowers · The ENEGRIN BESS

7. How much comes back on the bill

Surcharge (%) = 3/5 × (reference ÷ power factor − 1) × 100

Credit (%) = 1/4 × (1 − reference ÷ power factor) × 100

With a 90% reference, a power factor of 80% carries a surcharge of 7.5% on the bill subtotal. Corrected to 97%, the surcharge disappears and there is a credit of 1.8%.

With the 97% reference, which applies to plants of 1 MW or more, the same 80% power factor carries a surcharge of 12.8%. Corrected to 97%, there is neither a surcharge nor a credit.

The surcharge is capped at 120% and the credit at 2.5%.

8. Frequently asked questions

What is a capacitor bank for?

To correct the power factor. It supplies on site the reactive power your motors and transformers need, and the grid stops supplying it.

How is a capacitor bank sized?

With the demand in kW and two power factors: the one you have and the one you want. The kVAr are the demand times the difference between the tangents of the two angles. For 1,000 kW, going from 80% to 97% takes about 499 kVAr.

Which power factor should I aim for?

It depends on your reference. With 1 MW or more at medium voltage, or at high voltage, the Grid Code requires 0.97 lagging to 1.0. With less than 1 MW, your tariff adds a surcharge below 90%.

Does a capacitor bank lower energy consumption?

It does not lower the kWh your machines use. It removes the power factor surcharge, can earn you a credit and reduces the current in your cables and transformer.

What happens if I install too many capacitors?

Your power factor turns leading. The Grid Code requires staying between 0.97 lagging and 1.0, so overcompensating also takes you out of range. It also raises the voltage in your installation.

Does a capacitor bank fix harmonics?

No. If your plant has many harmonics, a bank without reactors can go into resonance and amplify them. In that case, banks with reactors or filters are used.

More on BESS

Send us your GDMTH bill and we’ll tell you which charge can be reduced.

An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.

Sources

  1. CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): section 5.5: reference, rounding and caps for the power factor surcharge and credit.
  2. SHCP (Mexico’s Finance Ministry), resolution amending the complementary provisions to the tariffs for the supply and sale of electricity, Official Gazette (DOF): surcharge and credit formulas.
  3. CRE, Grid Code (Código de Red), RES/550/2021, Official Gazette (DOF), December 31, 2021: section 2.4: power factor of 0.95 until April 8, 2026 and of 0.97 lagging to 1.0 afterwards, and section 2.8: harmonic limits.