Guide · Demand
Peak shaving: what it is and how much it saves you
Peak shaving is cutting your plant’s demand peaks to pay less for the charges that depend on them. Under Mexico’s GDMTH tariff, a single 15-minute peak in peak hours sets the capacity charge for the whole month.
Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026
Peak shaving in one minute
- Your bill charges demand (kW) separately from energy (kWh).
- Capacity is billed on your peak in peak hours. Distribution, on your peak of the month.
- In November 2026, each kW of peak-hour demand costs MXN 246.78 to MXN 386.38, depending on the division.
- The peak is cut by moving loads, generating on site or with a BESS.
- With a BESS, your operation does not change: what changes is where the energy comes from during the expensive hours.
In this guide
To apply this to your plant, an ENEGRIN engineer replies the same business day.
Talk to an engineer1. What is peak shaving?
Peak shaving is cutting your plant’s demand peaks. Demand is the power you draw from the grid at a given moment, measured in kW. A peak is the moment of the month when you draw the most.
An industrial bill charges those peaks separately from energy. If the peak falls, the charge falls, even if you use the same kWh in the month.
2. Why a 15-minute peak costs the whole month
CFE measures your demand in 15-minute intervals. Under the GDMTH tariff, two charges depend on the highest interval:
| Charge | Which peak it is billed on | What it costs in November 2026, depending on the division |
|---|---|---|
| Capacity | Your highest demand in peak hours | MXN 246.78 to MXN 386.38 per kW |
| Distribution | Your highest demand of the whole month | MXN 57.74 to MXN 221.09 per kW |
An extra 100 kW of peak-hour demand costs between MXN 24,678.00 and MXN 38,638.00 that month in capacity, depending on the division, whether it lasted 15 minutes or all the peak hours.
There is a cap: if your monthly consumption is low relative to your peak, CFE bills a demand calculated from your consumption instead of the measured one. How billable demand is calculated
3. Calculate what cutting your peak is worth
What is cutting your peak worth?
Choose your division and the month, enter your peak-hour demand and move the reduction slider.
Your peak-hour demand falls from 1,000 to 700 kW.
Depending on the division, the cut saves you between MXN 74,034.00 and MXN 115,914.00 per month on the capacity charge, or between MXN 888,408.00 and MXN 1,390,968.00 a year if the cut repeats every month.
Choose your division for the exact figure.
This is the tariff’s arithmetic with your numbers. It assumes the consumption-based demand cap does not apply, and it leaves out distribution, which also falls if that peak is the highest of your month.
4. Three ways to cut the peak
| Way | How it works | Its limit |
|---|---|---|
| Move or switch off loads | You schedule furnaces, compressors or pumping outside peak hours, or stagger them so they do not start together. | Depends on how much your process can change without affecting production. |
| Generate on site | Your own generation covers part of the load in the expensive hours. | Requires fuel and, from 0.7 MW, a generation permit. |
| BESS | The system discharges when your demand rises and the grid sees a lower demand. | It cuts up to its power in kW, for the hours its energy in kWh allows. |
The three can be combined. The first step is always to check which loads can be moved at no cost.
5. Peak shaving with a BESS
In peak hours, the plant draws energy from the BESS and the demand CFE records falls. Your operation does not change: the machines keep running the same, and what changes is where the energy comes from.
For this to work, the management system has to anticipate your demand. If it discharges too early, it runs out of energy when the peak arrives. If it discharges late, the peak is already on record. That is why the reduction is calculated with your plant’s real profile.
6. Peak shaving and load shifting
These are two different things that usually go together. Peak shaving lowers demand, in kW. Load shifting, or arbitrage, moves consumption from expensive hours to cheap ones and lowers the energy charge, which is billed per kWh.
In November 2026, a peak kWh costs between 1.7 and 2.1 times a base one, depending on the division. A BESS that charges in base hours and discharges in peak hours captures that difference and, in the same discharge, cuts the peak.
7. When it pays off and when it does not
- It pays off more when your peak-hour demand is among the highest of the month and your consumption is high enough for the cap not to apply. Short peaks are cut with little energy.
- With consumption that is flat around the clock, capacity also falls, but the cut has to be held through all the peak hours, and that takes more energy in the BESS.
- Energy counts, not only power: a system of 500 kW and 1,000 kWh holds 500 kW for two hours, or 250 kW for four.
- If the consumption-based demand cap already applies to you, cutting the measured peak does not lower the charge until you fall below the cap.
The way to know is your 15-minute demand curve, which CFE records and your meter stores.
8. Frequently asked questions
What is peak shaving?
Cutting a plant’s demand peaks to pay less for the charges that depend on them. In Mexico it is also called recorte de picos de demanda (cutting demand peaks).
How long must a peak last for CFE to bill it?
Demand is measured in 15-minute intervals. A single high interval in peak hours sets the capacity charge for the whole month.
What is the difference between peak shaving and load shifting?
Peak shaving lowers demand, which is billed in kW. Load shifting moves consumption from expensive hours to cheap ones and lowers the energy charge, which is billed per kWh. A BESS does both in the same discharge.
Can you do peak shaving without a BESS?
Yes: by switching off or moving loads during peak hours, or by generating on site. The limit is how much your process can change without affecting production.
Does peak shaving work on any tariff?
It works on tariffs that bill demand separately, such as GDMTH, DIST and DIT.
More on BESS
- BESS in MexicoWhat they solve, what the regulation says and how the contracts work
- What is a BESSIts parts and what it does at each hour of the day
- Grid CodeWhat it requires of your plant and how to comply
- Capacitor bankWhat it is for and how to size it
- Backup during outagesBESS, diesel generator or UPS
- What a BESS costsThe contracting models and what you pay in each
- How to choose a providerWhat to ask for in writing
- Permits for a BESSWhat the storage regulation requires
Send us your GDMTH bill and we’ll tell you which charge can be reduced.
An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.
Sources
- CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): demand for capacity and distribution (sections 5.1 and 5.2), measurement in 15-minute intervals (table 51) and time bands (3.1.5).
- CFE, “Tarifas finales del Suministro Básico” (final basic supply tariffs), effective November 1, 2026, Official Gazette (DOF): GDMTH tariff charges by division.
- Electricity Sector Law (Ley del Sector Eléctrico), Official Gazette (DOF), March 18, 2025, current text from the Chamber of Deputies: article 19: generation permit from 0.7 MW.