Billable demand and the capacity charge on the GDMTH tariff
Billable demand is the demand, in kW, that CFE bills you on. On the GDMTH tariff it goes into two charges: capacity, which comes from your peak in peak hours, and distribution, which comes from your peak of the month. In both, CFE bills the lower of your peak and a cap that depends on your consumption.
Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026
Demand in one minute
- CFE measures your demand every 15 minutes.
- Capacity is billed on your peak in peak hours, and distribution on your peak of the month.
- Both have a cap: your consumption ÷ (24 × days × 0.57).
- A single 15-minute peak in peak hours sets the capacity charge for the whole month.
- In November 2026, each kW of that peak costs MXN 246.78 to MXN 386.38, depending on the division.
In this guide
To apply this to your plant, an ENEGRIN engineer replies the same business day.
Talk to an engineer1. What is billable demand?
It is the demand, in kW, on which CFE calculates two charges on your bill: capacity and distribution. It is not the same as your consumption. Consumption (kWh) is how much energy you used in the month. Demand (kW) is how much power you were drawing at your highest moment.
CFE measures demand in 15-minute intervals. The highest interval of the month is your maximum demand, and any fraction of a kW counts as a full kW.
2. How does CFE calculate it?
CFE does not always bill the peak your meter recorded. It compares it with a cap that comes from your consumption and bills the lower of the two.
Demand for capacity = the lower of your maximum demand in peak hours and the cap
Demand for distribution = the lower of your maximum demand of the month and the cap
Cap = monthly consumption ÷ (24 × days in the period × 0.57)
The 0.57 is the load factor the CNE sets for the GDMTH tariff. The cap protects plants that use little relative to their peak: if the cap is lower than your peak, CFE bills the cap.
3. Example with a bill
A sample bill for January 2026: 1,934,678 kWh in 31 days, 3,070 kW of maximum demand in peak hours and 3,251 kW of maximum demand of the month.
- Cap: 1,934,678 ÷ (24 × 31 × 0.57) = 4,562 kW.
- Capacity: the lower of 3,070 and 4,562 is 3,070 kW. At MXN 401.78 per kW that is MXN 1,233,464.60.
- Distribution: the lower of 3,251 and 4,562 is 3,251 kW. At MXN 72.92 per kW that is MXN 237,062.92.
The two charges together add up to 34% of that bill’s subtotal. See the full bill
4. What does each kW of your peak cost?
The charge per kW changes with the division and the month. Choose yours and enter a peak.
What does your peak cost?
Capacity: 100 kW costs between MXN 24,678.00 and MXN 38,638.00 per month, depending on the division.
If it is also your highest peak of the month, distribution: between MXN 5,774.00 and MXN 22,109.00 per month.
Choose your division for the exact figure.
In November 2026, the capacity charge runs from MXN 246.78 per kW in Baja California Sur to MXN 386.38 in Golfo Norte, Norte, Valle de México Centro, Valle de México Norte and Valle de México Sur.
5. What happens if you cut your peak?
On the example bill, move the first slider to cut the peak in peak hours. The second moves energy from peak to base, which is what a BESS does when it charges in the early morning.
Try it with the example bill
Move the two sliders and see which lines change.
Move a slider to start.
This is the arithmetic of this bill, with the January 2026 charges of its division and before VAT. It does not include losses or the cost of a BESS, and it assumes the monthly peak does not rise while the BESS charges. What a system achieves at a plant is measured every month.
6. Contracted demand, kWMax and billable demand
These are three different numbers, and the bill shows all three.
| Concept | What it is | What it is used for |
|---|---|---|
| Contracted demand | The one you set when contracting. It cannot be less than 60% of your connected load, or than 100 kW, or than your largest motor or piece of equipment. | It defines your contract and which power factor reference applies to you |
| kWMax | The highest demand your meter recorded in the month, in any time band. | It goes into the distribution charge |
| Billable demand | The one that results from comparing your peak with the cap. | It is the one multiplied by the charge |
7. Frequently asked questions
Why do I pay so much for capacity if I used less energy?
Because the capacity charge does not depend on your kWh, unless the cap applies. It depends on your highest demand in peak hours. A single 15-minute peak in that band sets the charge for the whole month.
How often does CFE measure demand?
In 15-minute intervals. The month’s maximum demand is the highest interval, and any fraction of a kW counts as a full kW.
What is the 0.57 in the formula?
The load factor the CNE sets for the GDMTH tariff. A cap is calculated with it: your monthly consumption divided by the product of 24 hours, the days in the period and 0.57. If your peak exceeds that cap, CFE bills you the cap.
More on the GDMTH tariff
- GDMTH tariffWhat it is, its charges and what it costs in each division
- How to read your CFE billEvery line, with a sample bill
- CFE peak hoursBase, intermediate and peak, hour by hour
- Power factorSurcharge, credit and the 97% reference
- GDMTH bill calculatorYour bill by division and by month
- GDMTH tariffs 2026, month by monthThe charges of the 17 divisions in every month of the year
Send us your GDMTH bill and we’ll tell you which charge can be reduced.
An ENEGRIN engineer reviews it and replies the same business day. If you would rather estimate the savings of a BESS yourself, use the Ollin Simulator: it asks you to create an account with your company email.
Sources
- CNE, Resolution (Acuerdo) CT/11.SE/8-2025, final basic supply tariffs for 2026, Official Gazette (DOF): load factor of 0.57 (table 2), demand for capacity and distribution (sections 5.1 and 5.2), measurement and contracted demand (table 51).
- CFE, final basic supply tariffs, GDMTH tariff, effective November 1, 2026: charges of the 17 divisions, taken from CFE’s monthly publication.
- Sample bill on the GDMTH tariff, calculated with the charges CFE published for January 2026.