The GDMTH tariff explained: billable demand, capacity charge and peak hours
What each item is, how it is calculated and where it appears on your bill.
Resources
Guides written by ENEGRIN engineers, with figures and sources, and the actual date of their last review. CFE is Mexico's state-owned utility; GDMTH is its medium-voltage hourly tariff for large consumers.
Explore a GDMTH bill
Peak energy
kWh in the most expensive window (6-10 pm in winter, Norte). MXN 1.8372/kWh, 85 % more than base.
What a BESS does to it
The BESS discharges here: your plant draws from the batteries, not from CFE. It is the main source of savings.
−87 % in this example
What each item is, how it is calculated and where it appears on your bill.
Since April 8, 2026, Mexico's Grid Code (Energy Regulatory Commission resolution RES/550/2021) has required a power factor between 0.97 lagging and 1.0, measured every five minutes and met at least 95 % of the time each month. Who it applies to: medium-voltage plants with contracted demand of 1 MW or more, and all high-voltage plants. How it is measured.
The April 2026 rules issued by the CNE, Mexico's energy regulator: why batteries at your plant do not require a storage permit, which study CENACE, the national grid operator, requires, and which technical standards the system must meet.
Which one fits each plant and why, in a single table.
For plants above 1 MW: when it is cogeneration (steam, hot water or cooling from the engines' heat) and when it is on-site gas-fired generation, why a hybrid plant with BESS makes sense, and what changed with the CNE's April 2026 rules.
The terms on your bill and in your system, each explained in one sentence.