Mexico’s Electricity Sector Law: what changes for industry
The Electricity Sector Law has governed electricity in Mexico since March 19, 2025. It replaced the Electricity Industry Law. For an industrial plant it changes three things: how it can generate its own energy, who regulates it and which rules apply to storage.
Reviewed by Mario René Córdova de la Peña, electrical engineer and CTO of ENEGRIN, in November 2026
The law in one minute
- Published on March 18, 2025. It repealed the Electricity Industry Law.
- The regulator is the National Energy Commission (CNE), which replaced the CRE.
- Abasto aislado became self-consumption, with a permit from 0.7 MW.
- The State must keep at least 54% of the average energy injected into the grid.
- Storage has its own rules, and a BESS that only serves your plant does not require a permit.
In this guide
To apply this to your plant, an ENEGRIN engineer replies the same business day.
Talk to an engineer1. What it is and when it took effect
The Electricity Sector Law (Ley del Sector Eléctrico) was published in Mexico’s Official Gazette on March 18, 2025 and came into force the next day. It repealed the Electricity Industry Law of 2014.
The National Energy Commission Law was published the same day, and with it the regulator changed: the permits, tariffs and technical regulation formerly handled by the Energy Regulatory Commission (CRE) are now the responsibility of the National Energy Commission (CNE).
2. What changes for an industrial plant
| Topic | What the law says | Article |
|---|---|---|
| Generating for your own use | The category is self-consumption: a power plant of 0.7 MW or more for on-site needs. It replaces abasto aislado (isolated supply). | 30 to 33 |
| Generation permit | Required of every power plant of 0.7 MW or more. The earlier law required it from 0.5 MW. | 19 |
| Generation without a permit | Under 0.7 MW, and plants used only in emergencies or interruptions. | 19 and 25 |
| Cogeneration | It is a mode of the generation permit. Efficient cogeneration counts as clean energy. | 3 and 41 |
| Storage | It has its own definition and rules in the law, and CNE provisions. | 3 and 82 to 85 |
| Buying from a private supplier | Qualified user registration with the CNE, with an obligation to keep the registration. | 73 and 74 |
| CFE tariffs | The CNE issues the methodologies and uses them to set the final basic supply tariffs. | 158 and 159 |
| Fines | 10% of the previous year’s gross revenue for the most serious breaches. | 184 |
What does the law allow you to do?
Choose what you want to do with your plant’s energy.
I want to
Basic supply
Only CFE provides it, at the tariffs the CNE calculates. You can stay there even if you meet the requirements to be a qualified user.
Qualified supply
You register with the CNE as a qualified user and buy from a qualified services supplier. Once registered, you must keep the registration: three years must pass before cancelling it, with one year’s notice.
Self-consumption or distributed generation
Below 0.7 MW you need no permit. From 0.7 MW it is self-consumption, with a generation permit from the CNE, and it can be isolated or grid-connected.
Storage associated with your plant
A BESS that only serves your plant does not require a storage permit. A request for studies is filed with CENACE, and the system must meet the technical standards.
3. State prevalence and the 54%
The law gives the State preference over private parties in the generation and sale of electricity. It makes this concrete with a figure: the State must keep at least 54% of the average energy injected into the grid.
Private parties still take part, in three ways:
- Generation for the market. Power plants of 0.7 MW or more that sell in the Wholesale Electricity Market.
- Long-term production. The private party invests and all the output goes to CFE, by contract.
- Mixed investment. CFE holds at least 54% of the project.
Self-consumption sits apart from those schemes: it is generating for your own use, on your site.
4. Generating your own energy
This is the change that matters most to industry. The earlier law spoke of abasto aislado. The new one speaks of self-consumption, which can be isolated, with no grid connection, or grid-connected.
- From 0.7 to 20 MW, grid-connected self-consumption can have a simplified permit procedure.
- Under isolated self-consumption, all output is consumed on site and it is not considered electricity supply.
- Under grid-connected self-consumption, surplus is delivered without payment or sold only to CFE.
Self-consumption, distributed generation and PPAs · Industrial cogeneration
5. Storage with its own rules
The law defines the electricity storage system and devotes four articles to it. On that basis, in April 2026 the CNE published the provisions in force, with five modes.
The one an industrial plant uses is a BESS that serves only that plant: it does not require a storage permit, as long as it does not inject or sell energy to the grid. BESS in Mexico
6. Obligations and fines
- Grid Code. Plants at medium and high voltage must comply with it. The CNE issues and supervises that regulation.
- Clean energy. The energy transition obligations apply to suppliers, qualified users that take part in the market and those supplied through self-consumption.
- Fines. From 128,000 to 514,000 UMA (Mexico’s reference unit for fines, updated every year) for breaching the quality, reliability, continuity and safety provisions. 10% of the previous year’s gross revenue if the breach is serious, for operating without a permit or for connecting a power plant without an interconnection contract.
7. What happens to earlier permits
Permits and contracts granted under the Electricity Industry Law remain valid until their term ends. They are not extended. Their holders can request migration to the categories of the new law.
The same applies to the older self-supply (autoabastecimiento) and cogeneration permits. Whoever wants to take part in the market as a generator must migrate all of its capacity.
For those self-supply and cogeneration permits, on June 18, 2026 the Energy Ministry published the guidelines for a voluntary, fast-track migration, and on September 8, 2026 it extended their deadlines. The first step is to register an expression of interest, open until December 18, 2026. Migration applications are filed from September 21, 2026 to January 15, 2027. Load centers that do not migrate keep CFE’s basic supply under their current contract.
8. The dates that matter
| Date | What happens |
|---|---|
| March 18, 2025 | The Electricity Sector Law is published. It comes into force the next day. |
| October 3, 2025 | Its Regulations are published. |
| December 12, 2025 | The CNE publishes the self-consumption provisions. |
| April 9, 2026 | The Grid Code power factor rises to 0.97. The 0.95 requirement was in force until April 8. |
| April 16, 2026 | The CNE publishes the storage provisions and the cogeneration provisions. |
| May 8, 2026 | The Energy Ministry publishes the guidelines for the Self-Consumption One-Stop Shop. |
| June 18, 2026 | The Energy Ministry publishes the migration guidelines for earlier self-supply and cogeneration permits. |
| September 8, 2026 | It amends them and extends the migration deadlines. |
| December 18, 2026 | Registration of the expression of interest to migrate closes. |
| January 15, 2027 | Filing of migration applications closes. |
9. Frequently asked questions
What is Mexico’s Electricity Sector Law?
The law that governs the generation, transmission, distribution and supply of electricity in Mexico. It was published in the Official Gazette on March 18, 2025.
When did it come into force?
The day after its publication: March 19, 2025. Its Regulations were published on October 3, 2025.
Which law did it replace?
It repealed the Electricity Industry Law of August 11, 2014.
Does the CRE still exist?
No. Regulation is issued and supervised by the National Energy Commission (CNE).
Can I generate my own energy under the new law?
Yes. Below 0.7 MW without a permit, and from 0.7 MW as self-consumption, with a generation permit from the CNE.
What happens to my earlier self-supply or cogeneration permit?
It remains valid until its term ends, but it is not extended. You can request migration to the categories of the new law. For self-supply and cogeneration permits, the Energy Ministry opened a migration procedure: applications are filed until January 15, 2027.
What does State prevalence mean?
The State’s preference over private parties in the generation and sale of electricity. The law requires the State to keep at least 54% of the average energy injected into the grid.
More on generating your own energy
- Industrial cogeneration in MexicoWhat it is, when it makes sense and which permits it requires
- How a cogeneration plant worksIts parts and its energy balance
- Self-consumption, distributed generation and PPAsHow to generate or buy your energy
If your plant draws 1 MW or more and has access to gas, let’s talk.
An ENEGRIN engineer replies the same business day.
Sources
- Electricity Sector Law (Ley del Sector Eléctrico), Official Gazette (DOF), March 18, 2025, current text from the Chamber of Deputies: articles 3, 12, 19, 25, 30 to 41, 73, 74, 82 to 85, 144, 153, 158, 159 and 184, and transitory articles First, Second and Fifth to Ninth.
- Regulations of the Electricity Sector Law, Official Gazette (DOF), October 3, 2025: full text.
- CNE, general administrative provisions on self-consumption, Official Gazette (DOF), December 12, 2025: self-consumption.
- CNE, general administrative provisions for integrating electricity storage systems into the National Electric System, Official Gazette (DOF), April 16, 2026: storage.
- CNE, general administrative provisions for electricity generation in the cogeneration mode, Official Gazette (DOF), April 16, 2026: cogeneration.
- SENER, Guidelines for the Self-Consumption One-Stop Shop, Official Gazette (DOF), May 8, 2026: one-stop shop.
- CRE, Grid Code (Código de Red), RES/550/2021, Official Gazette (DOF), December 31, 2021: section 2.4: power factor of 0.95 until April 8, 2026 and 0.97 afterwards.
- SENER, Guidelines for the voluntary and fast-track migration of self-supply and cogeneration to the categories of the Electricity Sector Law, Official Gazette (DOF), June 18, 2026: migration procedure.
- SENER, resolution amending those guidelines, Official Gazette (DOF), September 8, 2026: articles 17 and 18: migration calendar, and article 26: load centers that do not migrate.
- Electricity Industry Law (repealed), article 17: generation permit from 0.5 MW.